Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/concept.tn/httpdocs/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the interactive-geo-maps domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/concept.tn/httpdocs/wp-includes/functions.php on line 6121
Energies Renouvelables - concept

Avenue Kheireddine Pacha 1073 Mont Plaisir +(216) 70 029 920 contact@concept.com.tn

Renewable Energies



Project Date
Preliminary studies of environmental impacts of two photovoltaic power plants in Skhira and Gabès in Tunisia with a power of 10 MW and 10 MW respectively 2019
Preliminary studies of environmental impacts of five photovoltaic power plants in Tozeur, Sidi Bouzid, Kairouan, Gafsa and Tataouine in Tunisia with powers of 50 MW, 50 MW, 100 MW, 100 MW and 200 MW respectively. 2019
Preliminary study of environmental and social impacts of a 10 MW photovoltaic solar power plant located in Gabe 2017
Preliminary study of environmental and social impacts of a 10 MW photovoltaic solar power plant located in Zarzis 2017
Preliminary study of environmental and social impacts of a 1 MW photovoltaic solar power plant located in Sousse 2017
Preliminary studies of environmental impacts of a photovoltaic power plant at FERIANA in Tunisia with a power of 10 MW. 2020
Carrying out environmental and social impact studies for the construction projects of 10 wind farms in the governorates of Médenine, Tataouine, Gabes, Siliana, Zaghouan, Tataouine, Kébili and Gafsa. 2021
Preliminary environmental impact studies of the project to build 4 photovoltaic power plants of 10MW each in the Gafsa region (El Ksar Gafsa 1, El Ksar Gafsa 2, El Ksar Gafsa 3 and El Ksar Gafsa 4 2021