The project aims to create a modernized infrastructure to meet the future water demands of the beneficiary irrigated areas, through physical developments and corrections to be undertaken on the canal, its equipment and its surroundings as well as a regulation and supervision system to be put in place. In addition, the continuity of hydraulic operation must be ensured during the different periods of the modernization.
The terms of reference are clearly explained and indicate that the consulting engineering firm will have to carry out the necessary technical studies, the control and supervision of the works as well as assistance to the project owner for the project support measures.