New extensions of primary and secondary networks on 23.5 kilometers (DN250 to DN500) ;
730 residential connections ;
Design of a new pumping station (capacity 105 l/s) ; detailed study for the implementation of pressure pipe (DN315) on 1.025 meters ;
Rehabilitation and extension of an existing pumping station (P2GL Grand Louga) for inclsion in the new collection system and wastewater capacity 5184 m3/day to 8.813 m3/day, preparation of detailed designs, technical specification files and tender docu-ments for pressure pipe (DN200) on 283.25 ml ;
The construction of a maintenance room. The tasks to be carried out concern the studies of Detailed project , execution and tender documents of the networks and works to be carried out, as well as the contracting and the supervision and control of the construction works of these works.