Resumption of the APD: Alignment of the report of the environmental and social study and Updating of the technical studies of infrastructures
Development of the CAD: Installation and development of the site: operating building, service roads
inside the site, rainwater drainage network; miscellaneous Equipment and supplies necessary for the proper functioning of the CET; water supply, electricity
Public utilities network, outdoor lighting
Construction and management of the landfill: construction of landfill cells, leachate drainage network, leachate treatment, biogas drainage and recovery network, environmental monitoring program, closure and redevelopment, etc.
The access track
Deliverables:APD and DAO of infrastructure and equipment specifications, in particular for the landfill site,ESIA/PGES of the project.