Avenue Kheireddine Pacha 1073 Mont Plaisir +(216) 70 029 920 contact@concept.com.tn

  • Home
  • Service REALIZATION OF THE TECHNICAL FEASIBILITY STUDY OF THE PROJECT TO OPTIMIZE THE MANAGEMENT OF SOLID HOUSEHOLD AND SIMILAR WASTE IN THE AUTONOMOUS DISTRICT OF ABIDJAN AND THE MODE OF CONTRACTING INFRASTRUCTURE IN THE FRAMEWORK OF A PPP

Pour plus d'information

+(216) 70 029 920
+(216) 71 905 262
contact@concept.com.tn

  • Country IVORY COAST
  • Location: ABIDJAN
  • Duration of the mission: 7.5 months
  • Name of the Client : Directorate General For Sanitation And Sanitation URBAN SANITATION AND RESILIENCE PROJECT

Waste management and treatment

REALIZATION OF THE TECHNICAL FEASIBILITY STUDY OF THE PROJECT TO OPTIMIZE THE MANAGEMENT OF SOLID HOUSEHOLD AND SIMILAR WASTE IN THE AUTONOMOUS DISTRICT OF ABIDJAN AND THE MODE OF CONTRACTING INFRASTRUCTURE IN THE FRAMEWORK OF A PPP


The purpose of this study is to provide the authorities with reliable technical and economic information on the additional organization to be put in place in the Autonomous District ofAbidjan for the optimization of the collection, transport, treatment and recovery of solid wasteconsistent with the cleaning services granted. Thus, it is a question of bringing a light on the organization in terms of equipment, infrastructures and contractual methods of realization of this organization. The main objective of the study is to carry out an operational plan to optimize the collection, transport, treatment and recovery of solid waste in the Autonomous District of Abidjan which is consistent with the cleaning services granted. .


MISSION 1: Diagnosis of the household and similar solid waste management system of the Autonomous District of Abidjan and the localities concerned by the study (Bassam, Sikensi and Dabou)
MISSION 2: Development of the operational plan for the pre-collection, collection, transport/transfer, treatment and recovery of solid household and similar waste in the localities concerned (Bassam, Sikensi and Dabou)
MISSION 3: Summary Preliminary Project Study of solid waste management infrastructure
MISSION 4: Preparation of business consultation files


Veuillez attendre le temps de chargement