Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/concept.tn/httpdocs/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the interactive-geo-maps domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/concept.tn/httpdocs/wp-includes/functions.php on line 6121
ÉVALUATION DES CONDITIONS DU BARRAGE DE GUMA : SYSTÈME DE TRANSMISSION ET DE RÉSERVOIRS ET ÉVALUATION DES PROCESSUS DE TRAITEMENT - concept

Avenue Kheireddine Pacha 1073 Mont Plaisir +(216) 70 029 920 contact@concept.com.tn

  • Home
  • Service ASSESSMENT OF CONDITIONS OF GUMA DAM, TRANSMISSION SYSTEM, RESERVOIRS AND TREATMENT PROCESS

Pour plus d'information

+(216) 70 029 920
+(216) 71 905 262
contact@concept.com.tn

  • Country Sierra Leone
  • Location: GUMA DAM
  • Duration of the mission: 6 months
  • Name of the Client : Millennium Challenge Coordinating Unit (MCCU)

Hydraulic development - water management and treatment

ASSESSMENT OF CONDITIONS OF GUMA DAM, TRANSMISSION SYSTEM, RESERVOIRS AND TREATMENT PROCESS


This project is designed to build the capacity of the company Guma Valley Water Company in the control of the water transmission system of the Guma dam and related works
The technical assistance is designed not only to produce specific assessments and maps generated by consultants, but rather to build the capacity of the GVWC in each area of work. This assignment is the second phase and includes the following:
Guma Valley Reservoir and Water Treatment Plant (GVWTP)
Assessment of the condition of the GVWC treatment plant, including the reservoir intake and raw water transmission pipeline and assessment of treatment processes at the GVWTP. Health, safety and environmental (HSE) conditions of the dam assessment.
Conveyance networks with their interconnecting pipes and operation of the sluice system.
Condition assessment of bulk water conveyance pipelines including service tanks, pump station and critical valves.


Activity 1: Development of the HSE plan detailing project initiation, start-up report and project management and health and safety plan.
Activity 2: Assessment of the condition of the Guma Dam, GVWTP, and the conveyance and reservoir system and evaluation of treatment processes at the GVWTP, including: Site surveys, Data collection, On-site examination and engineering assessment, including overall dam stability and confirmation of hydraulic capacity Preparation of the Preliminary Study for the complete evaluation which includes all of the above tasks with recommendations for improvement Assessment of the condition of the water conveyance pipes, and the raw water discharge pipes from Guma Dam to the treatment plant Draft and final report of the treatment and water quality processes and recommendations for its improvement and management
Activity 3: Implementation of a health and safety plan and procedure including: Health and safety training, Health and safety compliance monitoring and reporting provided in the HS monthly monitoring reports