ServiceTECHNICAL STUDIES, ASSISTANCE IN CONTRACTING AND SUPERVISION OF THE REHABILITATION WORKS OF THE WATER SUPPLY INFRASTRUCTURES OF THE CITIES OF BANGUI AND BERBERATI
Duration of the mission: 17 months (6 months study and 11 months work)
Name of the Client : MINISTRY IN CHARGE OF ENERGY AND WATER RESOURCES DEVELOPMENT
Drinking water supply and water resources management
TECHNICAL STUDIES, ASSISTANCE IN CONTRACTING AND SUPERVISION OF THE REHABILITATION WORKS OF THE WATER SUPPLY INFRASTRUCTURES OF THE CITIES OF BANGUI AND BERBERATI
The Water and Electricity Services Improvement Project (PASEEL), funded by World Bankwill upgrade all the treatment and pumping stations of the SODECA (Central African Water Distribution Company) facilities in Bangui and Berberati;
The following work is planned to be carried out:
FOR THE CITY OF BANGUI :
– Réhabilitation de la station d’exhaure ;
– Travaux d’amélioration de l’usine de traitement d’eau potable ;
Rehabilitation of the SP3 and hill pumping stations ;
Realization of a macro-metering system (treatment station, pumping and reservoirs) ;
Extension work on distribution networks in the various areas of Bangui ;
Creation of social connections
FOR THE CITY OF BERBERATI :
– Réhabilitation de la station d’exhaure ;
Work on the processing room ;
Rehabilitation and construction of Bornes Fontaines
Rehabilitation of the reservoir ;
• Phase I : Development of Preliminary studies (only for Bangui) and Detailed study (for the two cities) and preparation of the Bidding Documents (for the two cities) - duration of 5.5 months
Phase II : Assistance in screening, evaluation of bids and procurement of works - duration 1 month
Phase III : Works control and supervision (11 months).