Avenue Kheireddine Pacha 1073 Mont Plaisir +(216) 70 029 920 contact@concept.com.tn

  • Home
  • Service EXECUTION OF URBAN INFRASTRUCTURE PRIORITY (VRD) OF THE INTEGRATED DEVELOPMENT AREAS OF PORT AU PRINCE, MARTISSANT AND BAILLERGEAU

Pour plus d'information

+(216) 70 029 920
+(216) 71 905 262
contact@concept.com.tn

  • Country Haiti
  • Location: Martissant et Bailleregeau
  • Duration of the mission: Studies : 5 months Works supervision : 12 months
  • Name of the Client : MINISTRY OF PUBLIC WORKS TRANSPORT AND COMMUNICATIONS "MTPTC" -DIRECTION OF PUBLIC WORKS

Wastewater, Stormwater & Flood Protection

EXECUTION OF URBAN INFRASTRUCTURE PRIORITY (VRD) OF THE INTEGRATED DEVELOPMENT AREAS OF PORT AU PRINCE, MARTISSANT AND BAILLERGEAU


Following the earthquake of January 12, 2010, the Government of Haiti (GOH) requested support fromFrench Agency for Development in order to carry out urban infrastructure works and to assist in the reconstruction of the metropolitan area. This support was to be part of the reconstruction strategy, as defined by the Government and the representatives of the international community, namely: to get the affected populations out of the camps in which they had taken refuge, creating the conditions for their safe return to their original neighborhoods.
The Martissant Park sector, known as a "concerted development zone" (ZAC), was identified by CIAT as one of seven potential trigger projects. The neighborhood of Baillergeau has been selected as a second area of intervention for the execution of urban infrastructure, smaller in scale but with similar characteristics to some areas of the ZAC of Martissant.


PHASE I : STUDIES
Inception Report, Preliminary investment studies ; Topographic survey ; geotechnical survey
Social support studies
Population displacement Studies
Hydraulic and hydrological study
Technical studies of roads ; drainage and sewerage networks
Environmental and Social Management Plan
Sizing of structures (Gateway)
Elaboration of performance records and tender documents
PHASE II : ASSISTANCE TO BID EVALUATION AND SELECTION OF COMPANIES
PHASE III : CONTROL AND MONITORING OF WORKS


Veuillez attendre le temps de chargement