Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/concept.tn/httpdocs/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the interactive-geo-maps domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/concept.tn/httpdocs/wp-includes/functions.php on line 6121
ÉTUDE DE PROTECTION DU HAMMEM MELLEGUE GOUVERNORAT DU KEF - concept

Avenue Kheireddine Pacha 1073 Mont Plaisir +(216) 70 029 920 contact@concept.com.tn

  • Home
  • Service PROTECTION STUDY OF HAMMEM MELLEGUE KEF GOVERNORATE

Pour plus d'information

+(216) 70 029 920
+(216) 71 905 262
contact@concept.com.tn

  • Country Tunisia
  • Location: Governorate of Kef
  • Duration of the mission: 13 Months
  • Name of the Client : MINISTRY OF AGRICULTURE, HYDRAULIC RESOURCES AND FISHERIES " General Directorate of Dams and Large Hydraulic Works " Directorate of Water Mobilization Studies

Wastewater, Stormwater & Flood Protection

PROTECTION STUDY OF HAMMEM MELLEGUE KEF GOVERNORATE


The purpose of the study is the realization of the study and the presentation of scenario of protection of the archaeological site Hammem Mellegue which will be touched by the future retention of the Mellègue dam amont, il s’agit de trouver une solution pour que le site archéologique de hammam Mellègue sera protégé contre les eaux de la retenue du barrage Mellègue amont soit de déplacer ce site ou le protéger, sachant que la côte de la retenue normale est de 295 m NGT et la côte de plus hautes eau du barrage est égale à 304 m NGT.
The Design Office is called to present the technical solutions for the protection of the archaeological site of Hammem Mallègue which will be affected by the retained crack of the Mellegue dam upstream. These solutions will have to take into consideration the heritage value of the site and especially that of the classified historical monument while allowing its development. The landscape must be the least affected by the proposed solution.


PHASE I: PRELIMINARY DESIGN
STEP 2: PREPARATION OF BIDDING DOCUMENTS