The services consist in carrying out the study V.R.D. (Roads and miscellaneous networks) of the industrial zone which concerns the files of Plan d'Aménagement de Détail (PAD), of subdivision, the file of safety, the network of roads, the network of waste water, the network of rain water, the network of drinking water, the network of electrification MT, the network of public lighting, the fixed telephonic network and the network anti-fire.
All parts concerning urban planning and architecture are the responsibility of Dirasset InternationalIt should be noted that there is a hydrological study of the Industrial Zone. Concept will have to study it and decide on its quality, and possibly rectify it and correct errors, omissions and impacts.
1st phase: the establishment of the Detailed Development Plan (PAD), the subdivision file in preliminary design and the safety file, environmental impact study, hydrological study and traffic study
2nd phase: the detailed preliminary design of the various networks (road networks, storm water, waste water, public lighting, electrification, telephone, gas and drinking water)
3rd phase: Execution project and tender documents for all the roads and utilities