  • Service ETUDE DE LA MISE EN PLACE D’UN SYSTEME DE REFOULEMENT DES EAUX D’IRRIGATION A PARTIR DE LA STATION D’EPURATION ”CHOUTRANA” VERS LE TERRAIN DE GOLF DE «TUNIS SPORTS CITY»

Pour plus d'information

+(216) 70 029 920
+(216) 71 905 262
contact@concept.com.tn

  • Country Tunisia
  • Location: Between STEP Choutrana and Tunis Sport City
  • Duration of the mission: 08 weeks
  • Name of the Client : Boukhater Group

Wastewater, Stormwater & Flood Protection

ETUDE DE LA MISE EN PLACE D’UN SYSTEME DE REFOULEMENT DES EAUX D’IRRIGATION A PARTIR DE LA STATION D’EPURATION ”CHOUTRANA” VERS LE TERRAIN DE GOLF DE «TUNIS SPORTS CITY»


It is the installation of a system for the discharge of water from irrigation of the "Choutrana II" wastewater treatment plant:
1. to the ground of "Tunis sports city" for the watering of the golf course and green spaces whose owner is Bukhatir Group through the irrigation water,
2. the nature park that is planned for the edge of the North Lake and to the west of the Jardins du Lac subdivision owned by the company of Promotion of the Lake of Tunis " SPLT ".


Design and sizing of the pumping station (flow = 42 l/s)
Sizing of the generator and the appropriate transformer at the pumping station;
Layout and shimming of the delivery pipes (11 km of 400mm diameter HDPE pipe);
Implementation and dimensioning of the various particular works (suction cups, draining, ...) ;
Sizing of the surge tank
Modeling, analysis and study of the discharge system in transient regime by means of the HAMMER software;
Estimated capital and operating costs;
Elaboration of the tender documents.