  • Location: Region of Sidi Daoud
  • Duration of the mission: 6 months
  • Name of the Client : ONAS

Wastewater, Stormwater & Flood Protection

STUDY OF RUNOFF WATER MANAGEMENT IN THE REGION OF SIDI DAOUD


The present study of runoff water management in the area of Sidi Daoud (Tunis Sport City in the banks of the northern lake of Tunis) has been entrusted by the Ministry of Environment and Sustainable Development, represented by theNational Sanitation OfficeStormwater Department, to the Design Office CONCEPT-SA.
It is a study of quantification and management of stormwater in an area destined to host one of the largest sports and urban projects in the capital.

The hydrological and topographical characteristics of this region and the urban growth it has experienced over the past decade have strongly contributed to the current "problematic" runoff situation.

The scale of the existing and future infrastructures requires the assurance of the protection of these infrastructures against flooding, prolonged stagnation, traffic fluidity, etc. It is in this objective that the present study is registered.
The study area is located in the northern suburbs of Tunis (on the banks of the North Lake) about twenty kilometers from the city center.

This area corresponds to the entire watershed ''hydrological unit'' of Sidi Daoud. It is the elementary basins of the cities Essalema, Taieb Mhiri, Echouach and Zouaidia, El Aouina, Dar Fadhal, the locality of Sidi Daoud, the housing estates Ain Zaghouan North and South, part of the RN9, as well as the area dedicated to the project Tunis Sport City.

It is characterized by a topography of low slopes (0.1% to 0.2% towards the lake) and is limited by the coastal hills of Goulette-Carthage in the northeast, to the northern fringe of the area of the banks of Lake North


Site visit.
Collection of available data and information relevant to the project.
Validation and updating of previous studies
Diagnosis of the current situation of drainage, identification of the flooded zones and the stagnation of water, etc.
Updating of the database and the establishment of the new necessary data for the study.
Identification and diagnosis of the existing networks as well as the possible refusals (dis-charges).
Hydrological calculation of the inflows from the basins outside and inside the study area and calculation of the flows to be drained.
Hydrological and hydraulic modeling of the basins for the return period up to the millennium.
Layout and alignment of the primary and secondary stormwater networks, a total of 17,382 ml between the new network (extension) and the rehabilitated network.
Economic and financial study and preparation of the detailed design file on the basis of the variant selected by the client and whose components were the subject of a topographic survey.
Impact study of the projected developments on the environment and on the lives of local residents.