Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/concept.tn/httpdocs/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the interactive-geo-maps domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/concept.tn/httpdocs/wp-includes/functions.php on line 6121
ASSISTANCE TECHNIQUE, CONTRÔLE ET SUIVI DE LA RÉALISATION DE LA STATION D’ÉPURATION DE LA VILLE DE MAHDIA ET SYSTÈMES DE TRANSFERT DES EAUX BRUTES ET ÉPURÉES - concept

Avenue Kheireddine Pacha 1073 Mont Plaisir +(216) 70 029 920 contact@concept.com.tn

  • Home
  • Service TECHNICAL ASSISTANCE, MONOTORING AND WORKS SUPERVISION OF THE MAHDIA WASTEWATER TREATMENT PLANT AND THE TRANSFER SYSTEMS OF RAW AND TREATED WATER

Pour plus d'information

+(216) 70 029 920
+(216) 71 905 262
contact@concept.com.tn

  • Country Tunisia
  • Location: Ville de Mahdia
  • Duration of the mission: 40 months
  • Name of the Client : ONAS SENEGAL

Wastewater, Stormwater & Flood Protection

TECHNICAL ASSISTANCE, MONOTORING AND WORKS SUPERVISION OF THE MAHDIA WASTEWATER TREATMENT PLANT AND THE TRANSFER SYSTEMS OF RAW AND TREATED WATER


The services covered by this contract relate to the assistance of theONAS in the technical evaluation of the offers of the works companies, the control and the approval of the studies of design, dimensioning and execution, the follow-up of the civil engineering works, assembly of the equipments, the tests of reception and the commissioning of the wastewater treatment plant of the city of Mahdia and the systems of transfer of the raw and purified water
The deadline for Mission A is 4 months. The period of realization of the studies and works (Missions B and C) is 36 months divided into four periods:
Preparation period: 05 months
Period of execution of the works: 24 months
Development and start-up period: 04 months
Observation period: 03 months
The Consultant's services include three main missions described below:
 Mission A : Assistance technique à l’évaluation des offres
Mission B : Control of the studies and approval of the execution plans

Mission C : Control, follow-up and supervision of the works and control of the realization of the wastewater treatment plant of the city of Mahdia and transfer systems of raw and treated water


Mission A: Evaluation of the companies' technical offers and presentation of the evaluation report to the ONAS commission.
Mission B : Control of studies and approval of execution documents
MISSION C : Work control and supervision