Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/concept.tn/httpdocs/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the interactive-geo-maps domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/concept.tn/httpdocs/wp-includes/functions.php on line 6121
ASSISTANCE, CONTROLE ET SUIVI DES TRAVAUX DES STATIONS D’'EPURATION DE SUD MELIANE II - concept

Avenue Kheireddine Pacha 1073 Mont Plaisir +(216) 70 029 920 contact@concept.com.tn

  • Home
  • Service ASSISTANCE, CONTROLE ET SUIVI DES TRAVAUX DES STATIONS D’’EPURATION DE SUD MELIANE II

Pour plus d'information

+(216) 70 029 920
+(216) 71 905 262
contact@concept.com.tn

  • Country Tunisia
  • Location: BEN AROUS AND SOUSSE NORTH
  • Duration of the mission: 36 months
  • Name of the Client : NATIONAL SANITATION OFFICE

Wastewater, Stormwater & Flood Protection

ASSISTANCE, CONTROLE ET SUIVI DES TRAVAUX DES STATIONS D’’EPURATION DE SUD MELIANE II


The project consists of a recalibration, a rehabilitation and an extension in "design & build" mode of the water treatment plants Sud Méliane II comme suit :
Abandonment of WASTEWATER STATIONS I (all MTS works)
• Maintenance of SM II works
Transform the existing SM II WWTP into two separate quasi autonomous plants: a plant for urban water called the Urban sector and a sector intended for urban water including industrial water called the industrial sector.
Increase its hydraulic capacity from 40,000 m3/d to 90,000 m3/d and its biological capacity from 20,000 kg DBOS/d to 36,000 kg DBOS/].
- Independent treatment of effluents and sludge from the "urban" and "industrial" processes to reuse treated water from the "urban" process for irrigation and to use the sludge in agriculture.
Add a new pretreatment unit next to the SM II pretreatment
Add a primary settling structure
- Add a secondary settling structure
- Add a thickener
- Add sludge digestion facilities, digested sludge storage tanks, cogeneration
- Add a new sludge dewatering room
- Conversion of the first floor of the IIMS operations building into an analytical laboratory and two offices.


Mission A : Control of the studies and approval of the execution plans
Mission B : Control, monitoring and supervision of works and performance control