Avenue Kheireddine Pacha 1073 Mont Plaisir +(216) 70 029 920 contact@concept.com.tn

Search
Mauritania 2 months 2023

Waste management and treatment |

MISSION TO DEVELOP THE SOLID WASTE MANAGEMENT PLAN, ENVIRONMENTAL AND SOCAL IMPACT STUDIES AND PREPARATION OF THE DAO OF THE INFRASTRUCTURES TO BE REALIZED FOR THE COMMUNE OF KIFFA

The objective of the mission is to provide, on behalf of the Commune of Kiffa, the services of completion of the studies for the technical landfill center (CET) of Kiffa. This is the design of a reorganized and sustainable system of...

Tunisia 50 Months 2022

Wastewater, Stormwater & Flood Protection |

STRATEGIC STUDY OF FLOOD RISK MANAGEMENT IN TUNISIA

The objective of the study is to establish a national strategy that imposes a new approach to the prevention and management of flood risks throughout the Tunisian territory by 2050. It aims to ensure the coherence of actions carried out...

Maldives 6 months 2022

Waste management and treatment |

CONSULTING MISSION FOR THE REVISION OF THE NATIONAL WASTE MANAGEMENT POLICY AND THE FORMULATION OF A NATIONAL WASTE MANAGEMENT STRATEGY

The main objective of this mission is to formulate an integrated national WASTE MANAGEMENT strategy and resources with next steps and policy recommendations to fill the gaps in accordance with the government's Strategic Action Plan (SAP). The...

IVORY COAST 7.5 months 2022

Waste management and treatment |

REALIZATION OF THE TECHNICAL FEASIBILITY STUDY OF THE PROJECT TO OPTIMIZE THE MANAGEMENT OF SOLID HOUSEHOLD AND SIMILAR WASTE IN THE AUTONOMOUS DISTRICT OF ABIDJAN AND THE MODE OF CONTRACTING INFRASTRUCTURE IN THE FRAMEWORK OF A PPP

The purpose of this study is to provide the authorities with reliable technical and economic information on the additional organization to be put in place in the Autonomous District of Abidjan for the optimization of collection, transport, treatment and recovery. ..

Sierra Leone 6 months 2022

Waste management and treatment |

CONDUCTING ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENTS (EIES) AND PREPARING THE ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN FOR THE CONSTRUCTION OF A NEW SANITARY LANDFILL IN THE WESTERN ZONE

This project is part of the Sierra Leone Urban Resilience Project . The purpose of this ESIA study is to contribute to making the project reliable and sustainable from an environmental and social point of view and...

Mali 6 months 2022

Hydraulic development - water management and treatment |

REALIZATION OF THE OPTIMIZATION STUDY OF THE MANANTALI-GOUINA-FELOU WATERFALL

The objective of the optimization study of the management of the Manantali, Gouina and Félou cascade facilities is to provide SOGEM with the scientific basis for an adequate management of its current and future waterworks.

Tunisia 6 months 2022

Hydraulic development - water management and treatment |

STUDY OF THE DEVELOPMENT PLAN OF MEDJAZ EL BAB INDUSTRIAL ZONE - BEJA GOVERNORATE

The services consist in realizing the study (Roads and various networks) of the industrial zone which concerns the files of Plan of Development of Detail of allotment, the file of safety, the network of roads, the network of waters.

IVORY COAST 8 months 2022

Hydraulic development - water management and treatment |

ELABORATION DU PLAN D’URBANISME DE DETAILS (PUd) DES UNITES URBAINES N°5 (COMMUNES DE SONGON ET YOPOUGON) ET N°7 (PORT AUTONOME D’ABIDJAN) DU SCHEMA DIRECTEUR D’URBANISME DU GRAND ABIDJAN (SDUGA)

The general objective of this study is to promote the effective implementation of the development orientations recommended and adopted in the UPMGA. It is also a question of drawing up framework documents that will give the main lines of development of urban units

Tunisia 13 Months 2021

Wastewater, Stormwater & Flood Protection |

PROTECTION STUDY OF HAMMEM MELLEGUE KEF GOVERNORATE

The purpose of the study is the realization of the study and the presentation of scenario of protection of the archaeological site Hammem Mellegue which will be touched by the future retention of the dam Mellègue upstream, it is a question of finding a solution so that the...

Tunisia 2 months 2021

Waste management and treatment |

REHABILITATION AND DEVELOPMENT OF THE CONTROLLED LANDFILL OF AGUAREB IN SFAX FOR ITS CLOSURE

ANGed has ended the operation of the controlled landfill of El Gonna in Agareb which has reached its design capacity. In fact, this landfill has been in operation since April 2008 and has been used since then for technical burial...

Tunisia 36 months 2021

Wastewater, Stormwater & Flood Protection |

ASSISTANCE, CONTROL AND FOLLOW-UP OF THE WORKS OF THE WASTEWATER TREATMENT PLANTS OF SUD MELIANE II

The project consists of a recalibration, a rehabilitation and an extension in "design & build" mode of the South Melian II WASTEWATER STATIONS as follows: - Abandonment of the WASTEWATER STATIONS I (all the works of the SMT) - Maintenance of the...

Tunisia 24 months 2021

Hydraulic development - water management and treatment |

CONTROL AND SUPERVISION OF THE WORKS FOR THE REHABILITATION OF THE CANAL OF LAROUSSIA

L'objet du marché que compte réaliser le CRDA par l'intermédiaire de l'Ingénieur-conseil est la réalisation du contrôle et surveillance des travaux rentrants dans le cadre de la réhabilitation du canal Laroussia branche nord sur un linéaire de Total de 14...

REPUBLIC OF CENTRAFRIC 9 months 2021

Drinking water supply and water resources management |

MISSION DE REALISATION DES SCHEMAS DIRECTEURS POUR LE DEVELOPPEMENT DES SERVICES D’EAU ET D’ELECTRICITE, ETUDES D'APS, ET D'APD, DANS 7 VILLES SECONDAIRES EN CENTRAFRIQUE

The objective of the mandate is to carry out the Master Plans for the development of water and electricity services, as well as the Summary Preliminary Project (APS) and Detailed Preliminary Project (APD) studies in the seven (7) secondary cities in the Central African Republic. Towns...

Niger 8 months 2021

Drinking water supply and water resources management | Wastewater, Stormwater & Flood Protection |

ETUDE DE FAISABILITE DU PROJET D’ALIMENTATION EN EAU POTABLE ET D’ASSAINISSEMENT DES VILLAGES IMPACTES DANS LE CADRE DE LA DEUXIEME VAGUE DU PAR DE LA ZONE DU RESERVOIR DU PROGRAMME KANDADJI, ELABORATION DES APD ET DES DAO PHASE 2 : CONTROLE ET SUPERVISION DES TRAVAUX

Dans le cadre du Programme P-KRESMIN, l’ABK se propose d’élaborer un projet pour l’alimentation en eau potable et l’assainissement des villages de la vague2 ainsi que la mise à niveau de l’alimentation en eau potable de la vague 1 et...

Veuillez attendre le temps de chargement