WATER SUPPLY
The purpose of the study is to determine the technical and economic options best suited to the water resource, the population concerned and the project area, and to prepare the technical and administrative population concerned and the project area, and to prepare the technical and administrative documents necessary for the supply of the supply of the equipment and the execution of the development works by the contractors. This study must take into account
The resettlement of the population to be relocated above Coast 228. The census and the resettlement action plan carried out within the framework of the PAR2 study will be transmitted to the consultant as soon as the contract is signed, and will constitute an input. The study will also take into account the possibilities of interconnection of the water systems along the two banks for
The study will also take into account the possibilities of interconnection of the water systems along the two banks for a better optimization of the operating costs. The study will be carried out taking into account the technical, financial economic, environmental and social aspects. The study in question will be carried out in three distinct phases: ➢ The first phase (phase I), concerns the Preliminary Study Reports (APS) including Socio-Economic Study (SEE); ➢ The second phase (phase II), concerns the Detailed Preliminary Study (DPS) including detailed report for the specific studies detailed report for specific studies, execution documents, topographic works, and the preparation of tender documents (DAO); ➢ The third phase will concern: (i) the control and supervision of the works, (ii) the supervision of the implementation by the company/companies of the environmental (ii) supervision of the implementation by the company/ies of the environmental and social mitigation measures required by the ESMP, and (iii) implementation of the social (iii) implementation of social engineering depending on the preferred option for the management of the facilities
SANITATION
The service will consider the realization of sanitation activities taking into account the technical, financial, economic, environmental and social aspects of the different types of sanitation infrastructures (collective works), economic, environmental and social aspects of the different types of sanitation infrastructures (collective drainage works, collective sanitary (collective drainage works, collective sanitary works, family sanitary works). It will include: ➢ Technical studies of collective sanitation infrastructures (rainwater drainage, public kiosks, school latrines, latrines in health centers, types of (rainwater drainage, public aediculae, school latrines, latrines in health centers, types of family works); APS and APD for collective works; ➢ DAO for collective works
➢ Mechanisms for the realization of family works; ➢ Social intermediation on hygiene and sanitation;
PROJECT COMPONENTS ➢ The construction of a 15,000 m3 /day treatment plant including raw water intake and 3 raw water discharge lines SP1(Q=19.4 m3/h, Hmt=182.16 mcE), SP2(Q=106 m3/h, Hmt=93 mcE), ) SP3(Q=261 m3/h, Hmt=102 mcE) ➢ The installation of 157,550 ml of pipes for the delivery and distribution
The construction of a 150 m3 water tower with a 25 m high shaft. ➢ The construction of a 1,000 m3 water tower with a barrel height of 25 m. ➢ The construction of a water tower of 2,500 m3 and a height of 25 m ➢ The construction of a water tower of
of 500 m3 and a height of 25 m; ➢ The realization of a 4th line of refoulement at the enclosure of the castle CE3 in Ayorou SP4 (Q=40,5 m3/h, Hmt=201 mcE)