1st phase: the establishment of the Detailed Development Plan (PAD), the subdivision file in preliminary design and the safety file, environmental impact study, hydrological study and traffic study
2nd phase: the detailed preliminary design of the various networks (road networks, storm water, waste water, public lighting, electrification, telephone, gas and drinking water)
3rd phase: Execution project and tender documents for all the roads and utilities