acf
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/concept.tn/httpdocs/wp-includes/functions.php on line 6121interactive-geo-maps
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/concept.tn/httpdocs/wp-includes/functions.php on line 6121Avenue Kheireddine Pacha 1073 Mont Plaisir +(216) 70 029 920 contact@concept.com.tn
Veuillez attendre le temps de chargement
JANUARY 2020 - MAURITANIA: WASTE MANAGEMENT CITY OF ROSSO
CONCEPT, accompanied by ARTELIA and HYDROCONSEIL RIM, has just been charged by the World Bank of the project " Master plan study, environmental and social impact studies and preparation of call tenders for the solid waste management of Rosso The consortium will develop a waste management master plan and prepare the technical documents for the Preliminary Summary Design (PSD), the Detailed Preliminary Design (DPD), the Environmental and Social Impact Assessment (ESIA) and the Tender Documents (TD) for the creation and development of the infrastructures, and the supply of the corresponding mobile equipment, for the commune of Rosso.
The objective of the project is to design a reorganized and sustainable waste collection and disposal system by identifying the means, costs, and financial and organizational conditions in Rosso.
CONCEPT interviendra dans ce projet avec un Chef de de projet, un spécialiste de collecte de déchet, un économiste, un projeteur, un sociologue, un hydrogéologue et un environnementaliste.