acf
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/concept.tn/httpdocs/wp-includes/functions.php on line 6121interactive-geo-maps
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/concept.tn/httpdocs/wp-includes/functions.php on line 6121Avenue Kheireddine Pacha 1073 Mont Plaisir +(216) 70 029 920 contact@concept.com.tn
Veuillez attendre le temps de chargement
January 2025: Finalization of the program to strengthen the transfer infrastructure of the Eaux du Nord for the regions of Greater Tunis, Cap Bon, Sahel and Sfax. Study on the development of the Environmental and Social Management Framework (ESMF) - concept
The BRLI/CONCEPT group has just completed the study to develop the environmental and social management framework (ESMF), to strengthen the northern water transfer infrastructure for the Greater Tunis regions, Cap Bon, Sahel and Sfax
The study includes the two missions I and II:
Mission I:
Mission II :
Learn more about the project: https://www.concept.tn/em_services/programme-de-renforcement-des-infrastructures-de-transfert-des-eaux-du-nord-pour-les-regions-du-grand-tunis-cap-bon-sahel-et-sfax-etude-delaboration-du-cadre-de-gestion-environnementale-et-2/