Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/concept.tn/httpdocs/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the interactive-geo-maps domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/concept.tn/httpdocs/wp-includes/functions.php on line 6121
Janvier 2025 – LANCEMENT DU PROJET DE REHABILITATION DU GRAND CANAL LAAROUSSIA - concept

Avenue Kheireddine Pacha 1073 Mont Plaisir +(216) 70 029 920 contact@concept.com.tn

Janvier 2025 – LANCEMENT DU PROJET DE REHABILITATION DU GRAND CANAL LAAROUSSIA - concept

CANAL LAAROUSSIA

Janvier 2025 – LANCEMENT DU PROJET DE REHABILITATION DU GRAND CANAL LAAROUSSIA

15 janvier 2025 admin

Le 14 Janvier 2025 s’est tenue à l’hôtel Mouradi Gammarth le séminaire de lancement du projet Réhabilitation du Grand Canal Laaroussia.

Etaient présents : Le staff du CRDA de Manouba , la député de la région de Tebourba ainsi que le délégué régional de Manouba. Toute l’équipe projet du groupement CONCEPT/COBA/AGER en charge de ce grand projet était présente ainsi que la KFW, bailleur de fond en streaming. Les experts du groupement CONCEPT/COBA/AGER ont exposé les contours du projet, les enjeux pour la région et les défis à relever. 

Veuillez attendre le temps de chargement